QINOPACK
Menu
Practitioner notes · Quality
Pre-shipment inspection:
what to check
Most packaging claims we see were visible before loading: a stopper that fits only some cavities, a print shade that drifted from the approved sample, cartons that crush in the container. An inspection catches them only if the criteria were agreed before production started.
Agree before production
- A signed golden sample for each component, held by the factory and by the inspector.
- A sampling plan to ISO 2859-1, with AQL levels per defect class: critical, major, minor.
- A defect list with photos: what counts as a seed, blister, stone or print void, and from what size.
- Tolerances taken from the drawing, not “as per sample”.
Glass
- Weight, height, body diameter, brimful capacity and fill point.
- Neck finish against the drawing with go/no-go gauges, from every cavity number.
- Wall thickness at the thinnest point; residual stress on a polariscope.
- Visual defects under the same lighting for every lot.
Closures and decoration
- Fit on bottles from the same production lot, not on samples: insertion and extraction force, or application and removal torque.
- Colour against the approved sample in a light box; logo position and registration.
- Adhesion: tape test on print and coating; rub test with alcohol at your product’s strength.
Boxes, cartons and loading
- Box dimensions with the bottle inside; insert fit and closing.
- Carton marks, counts and dividers; drop test on a packed carton.
- Pallet pattern, stretch wrap and corner boards; photos of container loading and the seal number.
The report
- Photos, measured values per cavity and a clear decision: pass, hold or fail.
- Release the balance payment only after the report is accepted.
Next step
Planning an inspection?
Send your drawings, approved samples and order quantities. We will set up the checklist and run the inspection with the factories.